KST-047 · Ridgeline OKA-012 · Mbeya HRW-003 · Revised
Independent · Free · Mining & resources

Start from the rock.
Show the working.

Free, independent research on mining and resource companies. We build every call from the deposit up, publish it as a set of weighted scenarios, and revisit it in public when the facts change.

The register

Most resource coverage starts with a price target and works backwards. We start with what's in the ground, build up to what it might be worth, and say plainly where we could be wrong. A field notebook, not a trading floor.

01

Facts first

Drill results, filings and site visits before narrative. Every number links to its source.

02

Built bottom-up

Geology, then resource, mine plan, costs, value. No step skipped, no shortcut to a target.

03

Odds, not promises

Calls arrive as scenarios with probabilities attached, so you can see, and change, the weights.

04

Revisited in public

When the facts move, the note changes, and the old version stays visible beside the new one.

Method

From core sample to call.

Every note is logged like a drill core: layer by layer, from the geology at the bottom to the scenarios at the top. Scroll to work down the hole.

Layer 01 · Geology

What's actually in the ground.

We read the drill logs, assays and maps before any company presentation. Deposit type, continuity and depth decide most of what comes later.

  • Source documents linked inline
  • Plain-English glossary for every technical term
Layer 02 · Resource

How much, at what grade, with what confidence.

Measured, indicated and inferred tonnes are not the same thing. We show which category each tonne sits in, and how much the case leans on the least certain ones.

Layer 03 · Mine plan

Can it be dug, and how?

Strip ratios, recoveries, water, power, permits and people. This is where good deposits most often turn into slow projects.

Layer 04 · Costs

What it takes, all-in, per tonne.

We build costs bottom-up and check them against operating peers, then show the range rather than a single tidy number.

Layer 05 · Valuation

What it might be worth across prices.

A discounted cash-flow model at several commodity prices, with the model itself downloadable so you can test our assumptions.

Layer 06 · Scenarios

Weighted outcomes, in plain view.

Finally, three to five scenarios, each with a probability. The weighted value is our call, and the weights are open to argument.

A live call

Disagree? Move the weights.

This is how every call is published: the scenarios, what each is worth, and how likely we think it is. Drag the probabilities to see how much your view changes the answer, then tell us why.

Note No. 047 · Initiation

Kestrel Lithium — Ridgeline project

Hard-rock spodumene, Western Australia · 38 Mt resource

Fictional · Demo data

Fictional project assumptions

“Every note ends with the same heading: what would change our mind. If we can't write that section, we're not ready to publish.”
From our editorial standards
No. 047 · What would change our mind
  • 01The state EPA sets a hearing date before March. That removes most of the permitting delay.Stalls −10 pts
  • 02Infill drilling at the north pit fails to confirm the indicated tonnes the base case relies on.Base −15 pts
  • 03An offtake partner takes equity at or above the current price, which de-risks the financing.Stage 2 +5 pts
Revision log

We change our minds in public.

Every change to a call is logged with the date, the reason and the old numbers left visible. That includes the times new facts didn't change anything, and the times we were simply wrong.

Kestrel Lithium · No. 047

Permitting will take longer than we assumed.

The state EPA extended public comment by 60 days. We had underweighted that risk, so we moved probability from the base case to the delay case.

Stalls15%→20%
Base case50%→45%
WeightedA$1.99→A$1.92
Weights moved
Harrow Potash · No. 039

We got the trucking cost wrong.

A reader who runs haulage in the region pointed out our road-freight rate was a 2024 figure. They were right. Corrected, with thanks.

Haulage, per tonneA$38→A$51
WeightedA$0.74→A$0.61
Our error
Okoa Graphite · No. 041

New drilling, same view.

Twelve new holes came back in line with the resource model. We checked, and nothing changed. We log that too.

All scenariosUnchanged
WeightedA$0.33
Checked · no change
Tallis Uranium · No. 035

We removed a scenario.

The restart case relied on a mill that has since been sold. That path no longer exists, so it's gone, and its weight has been spread across the remaining cases.

Scenarios4→3
WeightedA$0.42→A$0.29
Scenario retired
Field notes

Latest research.

Company initiations, revisions and plain-language explainers. Each terrain is generated from the note's own survey grid, a small fingerprint for every piece.